2KR The project of effective use of biomass fuel

Project of use fuel from biomass which was signed between Project Implementation Unit 2KR Ministry of Agriculture and Food Industry of Moldova and Toyota Tsusho Corporation .
Assembling 25 modular boilers with an output power of over 8.7 MW.

which included works of automation, electrical and electromechanical works, water supply and ventilation.

   

Thermal plants was installed in the villages :

  • Branesti village with total power output of 232 kW
  • Trebujeni village with total power output of 232 kW
  • Furceni village with total power output of 348 kW
  • Jora de Mijloc village with total power output of 348 kW
  • Chiperceni village in Orhei district with total power output of 232 kW
  • Calimănești village with total power output of 232 kW
  • Șișcani village with total power output of 348 kW
  • Varzaresti village in Nisporeni district with total power output of 580 kW
  • Mascauți village with total power output of 232 kW
  • Raculesti village with total power output of 232 kW
  • Porumbeni village in Criuleni district with total power output of 116 kW
  • Maximovca village in Anenii Noi district with total power output of 232 kW
  • Mateuti village with total power output of 348 kW
  • Cuizauca village with total power output of 407 kW
  • Ignatei village in Rezina district with total power output of 348 kW
  • Lapusna village with total power output of 580 kW
  • Buteni village in Hincesti district with total power output of 580 kW
  • Micauti village in Straseni district with total power output of 580 kW
  • Cociulia village in Cantemir district with total power output of 580 kW
  • Razeni village in Ialoveni district with total power output of 580 kW
  • Pirlita village in Ungheni district with total power output of 348 kW
  • Cimislia city with total power output of 348 kW
  • Cricova village with total power output of 232 kW
  • Bubuieci village in Chisinau district with total power output of 348 kW
  Implementation period: August 2014 – December 2015                       The total value of the contract : 5 962 047,90 USD ( inclusive work of  SA”Darnic Gaz” )