Please translate in en_us: Please translate in ru_ru: Construcția cazangeriilor pe biomasă (UNDP)
Project of use fuel from biomass which was signed between Project Implementation Unit 2KR Ministry of Agriculture and Food Industry of Moldova and Toyota Tsusho Corporation .
Assembling 25 modular boilers with an output power of over 8.7 MW.
Continue reading 2KR The project of effective use of biomass fuel
Construction of biomass boiler plants in of the project was financed by the European Union and coordinated by UNDP ” Energy and Biomass „
- Implementation period was December 2011 – current .
- The estimated value of contracts is 3 450 000.00 $
2012 – Construction of water supply network in Carpineni village (Hincesti district). Project financed by European Union, Coordinator MSIF Moldova.
2012 – Construction of boiler plant with a capacity of 1300 kW in a professional school from the village Razeni (Ialoveni district). Project funded by the Ministry of Education.
2012 – Construction of boiler plant with a capacity of 360 kW for the professional school of Vulcanesti. Project funded by the Ministry of Education.
2011 – Design works to supply natural gas to the boiler house in the Gymnasium of the village Negreşti (Straseni district).
2011 – Desing-Works of gas pipelines in buildings of the region „Podis” (Straseni district) for natural gas supply of 220 individual houses.
2011 – Construction of boiler plant with a capacity of 800 kW for the professional school of Criuleni. Project funded by the Ministry of Education.
2011 – Construction of aqueduct (pipe diameter 200 mm, length of 4km) in the Manoileşti village (Ungheni district) . IFAD-funded project (World Bank).